AddPac AP-IP300 Installation Guide Page 132

  • Download
  • Add to my manuals
  • Print
  • Page
    / 163
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 131
AP-IP300 IP Phone Installation Guide Version 1.0
AddPac Technology Proprietary & Documentation
132
Chapter 5. Testing Operation
Booting Procedure and Operating Bases
The things that you have to know, prior to turning on the power of AP-IP300, are the booting
procedure.
AP-IP300 checks its basic operation of its interface, memory and CPU through a self-testing
procedure
After the Boot Loader is started, the IP100 looks for the appropriate software image file. At the
default configuration, AP-IP300 is set to load the software in the Flash Memory
If the IP100 fails to find the appropriate software image file, the Boot Loader stands by until the
appropriate file is found to be downloaded from the appropriate system, at the booting mode.
Once the software is downloaded, the IP-100 is to operate basing on the information of the
configuration which is saved. If there is no information of the configuration, the IP100 is to
operate with the initial setups. The operator needs to set up the related functions for the network
operation
When the power is 110voltage, you have to use the power cable of 110. Since the AddPac AP-
IP300 IPO Phone can recognize which is 110 or 220 voltage automatically, all you need to do is to
use the suitable type of the power cable. There is no need for an additional setups separately.
Page view 131
1 2 ... 127 128 129 130 131 132 133 134 135 136 137 ... 162 163

Comments to this Manuals

No comments